Generating set paralleling – Airport of Chania
Manufacturing and commissioning of control and power system to parallel two 450KVA generating sets. Completion date: 11/16
Manufacturing and commissioning of control and power system to parallel two 450KVA generating sets. Completion date: 11/16
Low voltage motor starter and controller of a 2000KVA rotating frequency converter. Completion date: 10/16
Automation Cabinet and gear for latest technology high end lighting control Using KNX and DALI devices. Completion date: 04/16
Low voltage Power distribution panels MV Switchgear and transformer 550KVA SoundProofed Genset. Completion date: 07/16